Facilities Maintenance Contextual Project
SUPPLIES
Home
Planning
Tools
Supplies
Measures
Reports
Standards

 
The necessary supplies must be purchased and prepared prior to beginning construction.
Pedestal
  Constructed in the shop in sections prior to beginning project. 

   Materials include: 

  • 1" x 10" pine board
  • 1/2" wood screws
Cabinets
   Bought pre-made from local supply store.

    Dimensions:

  • Length: 3'
  • Width: 2'
  • Height: 3'

Miscellaneous Supplies
  • Cedar shims (3 packs - 12 per pack)
  • White wood primer (1 gallon)
  • White paint (1 gallon)
  • Metal angle brace - 3" (one needed for every 2' section)
  • Concrete anchors (to be used with angle brace)
  • Caulking material (1 tube)
  • Wood screws (one box 1/2" length; one box 1" length)
 

 

Site Development by B.E.S.T. PRACTICES®